The system is finally working. I am happy to say that 270 gallons of water are in the barrels at this moment. If we had more storage there would have been a lot more. It is a start. Now to the next project : delivery and distribution to the garden.

Here is my next project. I am in the middle of it now. It is basically a lot of plumbing . The object of the game is to get the rain water which is currently going down the drain to the storm drain which ends up in the Wissahickon creek . Its not a great set up. It pollutes the creek and overloads the sewage system.











I moved in to our building in May. We are a two story structure and I live on the second floor. I also have southwest and west facing windows. So I was concerned about my comfort level in the summer. After examining the roof (which was only 3-4 years old ) it had'nt been coated. So I pressed to have it done. The prevailing consensus was to silver coat it. I did some research online and discovered that white coating was far superior. So I lobbied to have that done. Cost became an issue because the one quote we had for white coting was triple the cost of the silver application. I pressed on and got three more quotes. Finally I settled on Simpson Roofing Co. which managed to do the project for the same cost as the original cost of silver coating which is much less labor intensive.